Installation

Installation of the PetroGauge system will be performed by a trained and certified installer. Besides being trained in the technical hardware and software aspects of the installation task, the certification requirement also includes appropriate insurance to protect both the customer and the property.

The installer will perform the tasks of:

  • Site evaluation and preparation including confirmation of demographic information,
  • Installation of ATG interface hardware, if necessary,
  • Mount the PetroGauge Interface Module (PIM),
  • Connect the ATG to the PIM as required by the site configuration,
  • Install Ethernet connection hardware as required by the site configuation,
  • Perform software download and system configuration,
  • Test the system and confirm data communication.